Before swapping a bedroom and home office, plan three things: the final position of each piece of furniture, its route and the order of movements. A flat can have enough overall floor space while offering no free temporary holding area during the work. Clarify that sequence before asking a company to assess the job.
Check how the destination room will work
List the furniture with current and intended positions, width, depth and height. A simple sketch is enough to start the discussion. Mark doors, windows, radiators and other fixed features. Check more than the footprint: wardrobe doors, drawers and the room door must still open, and necessary walking routes must remain clear.
For tall or bulky pieces, record obstacles between the rooms, including door openings, corners, steps and low passages. Let the company assess whether an item can be moved intact. Comparing ceiling height with wardrobe height alone does not, for example, explain how a dismantled wardrobe can be raised after reassembly.
Agree temporary space and a sequence
Start by identifying which area must be cleared first. Exchanging the contents of two occupied rooms may require a suitable third space. Choose it together without obstructing entrances or essential passages. Ask the company for an understandable sequence instead of having everything removed from both rooms at once.
Prepare contents separately as agreed. Label boxes for their destination room and keep everyday essentials accessible. Ask which cupboards, drawers or shelving units must be emptied. A short journey within the home does not mean every piece of furniture can be moved while full.
Also decide where you can stay during the work. Children and pets need an area outside the carrying route. If the route includes communal areas, coordinate their use with the rules applicable to the building.
Separate moving, dismantling and securing
Describe wall fixings, fragile parts, known existing damage and connected equipment. Have the quotation distinguish items simply repositioned from those requiring dismantling and reassembly, and identify who handles necessary fixings at the destination. Do not assume all these tasks are included in carrying furniture.
Built-in furniture, unclear fixings or electrical connections need professional assessment in advance. Ask which work the company can perform and which requires an appropriately qualified specialist. Do not remove a restraint in preparation if this leaves furniture unstable. Use it again only once the agreed securing work is finished.
Coordinate the route and any cleaning
[Suva](https://www.suva.ch/de-ch/praevention/nach-gefahren/gefaehrliche-materialien-strahlungen-und-situationen/sichere-lagerung-und-innerbetrieblicher-verkehr/transportmittel-in-der-logistik) emphasises planning and suitable handling aids for internal transport. Describe flooring, thresholds and tight spaces so the company can choose its method and equipment. Test-pushing heavy furniture is not a necessary preparation for you to carry out.
If a cleared room needs cleaning, allow a separate stage before furniture moves back in. Agree who cleans and when the floor can be used again. Two teams should not have to share the same narrow passage simultaneously. Also specify who lays down and removes protective materials.
Review the layout before refilling cupboards
Once the larger pieces are positioned, check that doors and drawers remain usable and the agreed fixings are complete. Inspect the furniture and accessible floor areas together. Raise layout changes while cupboards are still empty, and have any effect on the scope and price confirmed.
For a request through REQAVIA, select moving and describe the internal furniture move in the text: rooms, item list, dimensions, floors and required dismantling or reassembly. State explicitly if no vehicle is needed. You can later share photographs and sketches directly and privately with the company. REQAVIA is an intermediary platform; price, scope and execution are agreed directly with the company.
