If old wallpaper is to become a smooth painted wall, request a quotation for the whole route to the finished surface. The condition beneath the paper is not fully visible before removal. Separate stripping, assessment of the exposed wall and preparation for the agreed finish. A low quotation for removal alone may cover a very different job from a complete painting service.
What should a smooth wall look like?
Describe the intended result: paint without the wallpaper’s texture, a deliberately visible texture or another solution proposed by the contractor. Discuss whether a paintable lining would be acceptable. Ask what preparation the existing surface would need. The phrase “ready to paint” does not establish a shared expectation of the final appearance.
Agree a suitable sample area using the proposed preparation and finish. View it under the lighting you normally use, including beside windows and wall lights. Record the colour, sheen and accepted surface texture. An online photograph can explain a preference without promising the same result on a wall whose underlying condition is still unknown.
Clarify the assessment before any stripping
Give the known building age, previous renovations and visible wallpaper layers. Identify stains, loose areas, cracks and places where work has already started. Photographs can help prepare a visit but cannot show the condition of concealed layers. Do not open up or sand more areas yourself simply to make a quotation more precise.
[Suva’s guidance](https://www.suva.ch/download/regeln-und-tipps/asbest-erkennen--beurteilen-und-richtig-handeln-instruktionstipps-fuer-maler-und-gipser/asbest-erkennen--beurteilen-und-richtig-handeln-instruktionstipps-fuer-maler-und-gipser--88295.D/null) calls for work to stop and the situation to be assessed when asbestos is uncertain during renovation, particularly in older buildings. Have potential hazards assessed before disturbing materials. A planned sample area does not authorise independent scraping, drilling or sanding.
In rented accommodation, clarify the project in writing with the landlord first. The [Federal Housing Office’s English brochure](https://www.bwo.admin.ch/dam/de/sd-web/xKj1v2BhllVl/englisch.pdf) states that changes such as painting walls require the landlord’s prior written consent.
Break the quotation into understandable stages
Ask for a separate description of wallpaper removal and removal of the resulting waste. The exposed surface then needs assessment: which residues, missing areas or defects would the company address? Have the proposed treatment of these points described. Ask whether preparation is limited to isolated repairs or extends across complete wall areas.
For painting, identify the walls concerned, the agreed preparation and the intended result. Supply wall widths, room height, number of rooms and major openings. Ask the contractor to confirm the measurement basis used in the quotation. Prices per square metre are only comparable when the work and exclusions are the same.
Set a decision point for unexpected discoveries
Agree beforehand when the contractor must pause and contact you: for example, additional layers, extensive loose areas or damp. The update should explain the finding, proposed next steps, additional work and effect on timing. Photographs can support that discussion. Authorise an extension only after those points are clear.
Damp, unusual damage or uncertain materials need assessment of the cause and a safe way forward by the appropriate specialist. A new finish should not simply hide an unresolved area. Decide who will arrange the assessment and which tasks must wait for its outcome.
Plan room use and the final inspection
Clarify protection of floors, furniture and adjacent surfaces, and how sockets and covers will be dealt with. Agree who moves furniture, keeps routes clear and tidies afterwards. Ask for access, ventilation, drying and use instructions appropriate to the actual work. Avoid fixing furniture return to a date that leaves no room to adjust the preparation.
At completion, compare the agreed surfaces with the sample and work description. Record outstanding points with the company. Keep the details of materials used and the care instructions.
In a painting request through REQAVIA, describe the wallpaper, wall measurements, known building age, visible defects and desired result in the text. Share photographs later directly and privately with the company. REQAVIA is an intermediary; agree the scope, price, dates and execution directly with the contractor.
