When the new fridge arrives, the driver may not be responsible for removing the old one from the kitchen. Check before the appointment whether disconnection, carrying and transport to a suitable recipient are included, or only delivery. A fridge follows a separate electrical-appliance return route. Do not simply add it to a sofa and table and assume everything goes to the same destination.
What should you check first?
The Federal Office for the Environment explains that covered electrical appliances must use their separate return channels and that retailers take back the types they stock free of charge, even without a new purchase. This does not automatically mean free carrying and transport of a heavy appliance from your flat. Ask for take-back and home-handling services to be explained separately.
- Send the appliance type, dimensions and a photo of its location. Say whether it is freestanding or built into the kitchen; an integrated unit may need removal work beyond ordinary transport.
- Follow the appliance's preparation instructions, remove food and dry the necessary areas. Time the work so water is not left along the carrying route.
- State the floor, lift, door widths and any outside steps. Request a carrying assessment rather than experimenting with unequipped helpers.
- Confirm the receiving organisation and its requirements without dismantling refrigeration circuits or trying to extract substances from the appliance.
Do not wait for the replacement to arrive
A common problem is the new delivery arriving while the old fridge still occupies its space, delaying installation or multiplying handling. Confirm the sequence in writing: prepare the old appliance, remove it, bring the new one in, and keep work space and doorways available. If a stage is excluded, identify who will do it beforehand.
If the appliance still works and you want to give it away, state its condition, approximate age and known defects honestly. Do not describe an unsafe or unassessed appliance as ready to use. Reuse requires someone able to assess and transport it; it does not justify unplanned disposal.
A request that supports a clear answer
Describe the fridge, its dimensions and the carrying route through REQAVIA. Ask the company which work it accepts and which requires another provider. Record three separate steps: who prepares the appliance, who carries it, and who accepts it at the destination? Do not book one step on the assumption that somebody else will handle the remainder. Confirm the destination and scope before the replacement arrives so the kitchen can be cleared without an unresolved handover.
