PRACTICAL IDEAS FOR YOUR NEXT STEP

Before painting a rented apartment: seven details to agree

Colour, surface, consent, protection and handover: make the project clear to you, management and the painting company.

Large removable paint samples beside protected furniture in a rented apartment.
AI-generated illustrative image.

You may picture the result from a small colour sample, while the painter sees a surface needing preparation and management sees a change to the apartment. Bringing those perspectives together before starting can prevent avoidable rework. First define the change: one wall, the whole room, the ceiling or doors too.

Make the permission specific

Review your agreement with the landlord or management and obtain written clarification before changing colour or finish. Include photographs, the colour reference and the surfaces concerned, and ask about requirements when you eventually leave. Do not assume verbal approval to “refresh the room” includes woodwork or a damp wall. If obligations are disputed, seek tenancy advice before proceeding.

Put seven details in the quote

Specify area, colour code, sheen, surface preparation, furniture and floor protection, working and drying schedule, and how the result will be accepted. Clarify inclusions and work needing further approval if inspection reveals a defect. State whether small holes and scratches are included in preparation and who moves and returns furniture.

Try the colour in the actual room

Use an agreed suitable sample and view it in daylight and evening lighting, next to the flooring and curtains that will stay. Record product and colour codes instead of relying on a phone picture. If environmental criteria matter, request specific information about the proposed product and its intended use. Ask the professional to explain its suitability for your surface as well.

Do not squeeze preparation time

Have peeling, cracked or discoloured areas assessed. Covering a mark does not prove its cause has been resolved. In an older building, do not scrape unknown layers yourself. Give the company the construction date and information about earlier work so it can determine whether specialist assessment is needed before preparation.

Send a brief that prevents guessing

Mention the tenancy, permission status, walls and ceilings involved, furniture remaining and the date you need the room. Include difficult areas and request a clear protection and handover plan. Describe the painting project through REQAVIA, then agree execution directly with the company in line with management’s consent and the apartment’s condition. Enter the need as text on REQAVIA; share photographs directly with the company after contact.

Back to the journal