Empty flat ready for painting? Check water, power and access

An empty room is only the start: confirm utilities, access, protection and daily closing arrangements before the painting team arrives.

Empty apartment with a clear access route and materials prepared for painting.
Illustrative image generated with artificial intelligence.

A flat can be empty and still be unready for painting. Before confirming the start, ask the company what water, electricity, lighting, access and storage space its proposed work needs. Check what is actually available and agree how any gap will be resolved. This is more useful than discovering at the door that the equipment cannot enter or an essential utility is unavailable.

Confirm the practical requirements

Name the rooms and surfaces included, then ask which facilities must remain available throughout each stage. Does the team need access to a particular tap or utility room? Is the lighting adequate in the hall after lamps have been removed? Who provides any temporary work lighting? Record the answers against the actual premises rather than assuming that the company brings everything.

Check accessible taps and normal lighting controls in the ordinary way. Do not open electrical panels, modify connections or try to restore a disconnected supply yourself. Report unavailable utilities, damaged sockets or exposed wiring to the responsible person and the company. A qualified person should resolve technical defects before those facilities are used. Any alternative arrangement needs agreement in advance.

Walk the route from the entrance to the room

Describe the floor, lift, stairs and narrow doorways. Ask whether the planned equipment fits and what measurements are needed; do not guess its size. Clarify the permitted unloading position and any building arrangements with the management. Tell the company about locked basement doors, lift reservations or access restrictions before scheduling delivery.

Remove remaining moving boxes from the agreed route and keep exits clear. Do not offer a chair or cupboard as access equipment. BFU’s cleaning advice rejects chairs and boxes as substitutes for suitable climbing equipment. Where a mobile scaffold is proposed, Suva’s prevention guidance stresses correct assembly and use. Let the company plan appropriate equipment for the actual work.

BFU: safe planning for cleaning (German)

Suva: safe use of mobile scaffolds (German)

Describe what remains in each room

An “empty flat” may still contain a cooker, curtains, built-in cupboards or boxes awaiting collection. Make a room-by-room list and agree who moves, protects and returns each item. Identify newly finished floors and give the company the care instructions you hold. Ask it to confirm the proposed protection before work starts; no covering is automatically suitable for every finish.

Explain whether the kitchen and bathroom may be used, where tools and materials may be kept, and which spaces remain excluded. Mention removed lamps or fittings and identify who is responsible for any reinstatement. Do not include electrical work silently in a painting request. If another trade still needs the same room, resolve the sequence together.

Agree the end of each working day

Choose one contact who can answer questions while you are away. Establish the entry and key-return arrangements directly with the company, without putting access codes in a general request. Agree who closes windows and doors, handles any ventilation instructions for the work and checks that materials are stored in the agreed place. Clarify how access works the following morning.

Before completion, arrange the removal of protection, agreed cleaning of work traces and return of included items. Walk through the rooms against the agreed list and record unfinished points. A quick check that the flat looks tidy does not confirm that every preparation or reinstatement task was included.

Send a useful painting request

State the rooms, remaining contents, known utilities, access limits and desired dates. List any unresolved readiness issue so the company can assess it before committing. REQAVIA is an intermediary: submit the need as a text description and agree scope, price and execution directly with the company. Share helpful photographs privately with it during coordination. A confirmed preparation list gives the visit a realistic starting point.