PRACTICAL IDEAS FOR YOUR NEXT STEP

Attic and storage-room belongings: plan their exit before moving day

Tight access and long-stored items deserve an early check. Do not leave the attic as an unexpected final stop after the apartment is loaded.

A bright attic with organised boxes and a clear route via a fixed staircase.
AI-generated illustrative image.

You may visit the attic only a few times a year to collect a suitcase, but emptying it is a different task. Some items may have arrived before changes to the space, and some old boxes may no longer be sound. Do not leave the attic or store room for the team to discover after loading the apartment. Check access and contents early so they are included from the start.

Check the route before the load

  • Describe access precisely: a fixed staircase or special opening, corridor length, lighting, thresholds and low ceilings.
  • Identify long items or those of unknown weight, sending photographs and measurements without attempting a trial removal.
  • Inspect older boxes externally and replace damaged packaging where you can do so safely.
  • Separate belongings to move from items still needing sorting or removal, and decide their destination before the appointment.

If access requires special equipment or does not allow stable movement, ask the company to assess it. Do not build temporary routes from unsecured boards or lower heavy items through openings using household ropes. Suva stresses equipment appropriate to the load. Difficult access is a reason for more careful preparation, not extra risk to save a few minutes.

Resolve unknown contents

An old box labelled “miscellaneous” needs opening and sorting before it joins the moving load. It may contain documents to keep with you, someone else’s property or materials with particular handling requirements. Do not dispose of shared belongings without agreement, and do not leave those decisions to a team hired for a defined transport task.

A common mistake is estimating the move only from occupied rooms. Describe the attic or store room separately even if everything will go into the new cellar. If you have not completed the inventory, say so and request a visit or a suitably conditional estimate rather than presenting a guessed box count as certain.

Arrange keys or permission in advance and decide who will accompany the team through shared areas. You can explain these conditions in a REQAVIA request, then agree handling, equipment and scope directly with the company. A known route and known load make it easier to organise the rest of the day without an extra task hidden above the ceiling.

Suva: Umgang mit Lasten

Back to the journal